Skeeter Solar
251 MW generation in Jones, TX · In queue since June 2024 · Proposed COD December 2028
251 MW
Capacity
1
Components
Solar
2y 5m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-02
Projected COD moved
1 time
Dec 2028 → Jun 2029
Net change
+6 months
first report to latest
Capacity
250 → 251 MW
changed in the reports
Latest stage
Facilities study done
last listed Aug 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Entered ERCOT queue for Facility Study phase
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of December 2028. No independent news or press releases found to validate or contradict this date.
Developer: Only LBNL filing identifies Mesquite Solar, LLC as developer. No news coverage or corporate announcements found to identify a parent operating company or confirm this is a project-LLC shell.
Status: LBNL shows Active status in Facility Study phase as of June 2024 queue entry. No public announcements or milestones found to indicate progression beyond interconnection studies.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Skeeter Solar is a proposed 251 MW solar photovoltaic development project located in Jones County, Texas. The project is being developed by Mesquite Solar, LLC and is listed in the interconnection queue of the Electric Reliability Council of Texas (ERCOT) under queue ID ERCOT-29INR0026. It is classified as a generation project consisting of a single solar component with a capacity of 251 MW. The project's proposed point of interconnection is the 345 kV Sweetwater East (11420) – Long Creek (1435) transmission line.
The project entered the ERCOT queue on June 3, 2024, and has a proposed commercial operation date of December 2, 2028. Its interconnection agreement status is listed as being at the Facility Study stage. The project's current status in the queue is recorded as suspended.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Aug 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Jones
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Mesquite Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
345 kV SWEETWATER EAST (11420) - LONG CREEK (1435)
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Skeeter Solar
Data-driven briefing on Skeeter Solar — fleet, generation, financial, and news signals.
RP SCG Texas Solar
Summary analysis with parallel narrative sections and visualizations.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.