Falcon II Solar (ERCOT-28INR0482) — Project Summary

Queue ID
ERCOT-28INR0482
Capacity
100.32 MW
Technology
Solar
Status
active
Location
Zapata, TX
Region
ERCOT
Developer
Falcon Energy Project
IA Status
—

Falcon II Solar

ERCOT-28INR0482BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

100.32 MW generation in Zapata, TX · In queue since March 2026 · Proposed COD February 2032

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

100.32 MW

Capacity

0

Components

8 months

In Queue

—

IA Status

COD target: 2032

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 11m

Pre-Study0%
Queue EntryMar 29, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2032-02-16

Queue history
28INR0482 · 7 monthly ERCOT reports, Mar 2026 – Sep 2026

Projected COD moved

1 time

Jun 2029 → Feb 2032

Net change

+32 months

first report to latest

Capacity

100 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 29, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jun 24, 2029
Differs from queue: Feb 16, 2032From queue filing
Developer in saved assessment
Falcon Energy Project
From queue filing
Status at research time
Active
Active — queue position secured, no public announcements on permitting or construction timeline
Financing
Not recorded

Milestones in this assessment

IA executedMar 29, 2026

Entered ERCOT interconnection queue

COD targetJun 24, 2029Latest in this assessment

Proposed commercial operation date per LBNL queue filing

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of June 2029. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL lists 'Falcon Energy Project' as developer. No news coverage or corporate information found to identify if this is a shell LLC or operating parent company.

Status: LBNL status shows 'active' with 2026 queue date. No news coverage found to indicate project progression beyond initial interconnection application.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Falcon II Solar is a proposed photovoltaic solar development project in Zapata County, Texas, with a total planned capacity of 100.32 MW. The project is being developed by Falcon Energy Project and is classified as a generation project. It would connect to the grid at the 8004 Revilla 138 kV point of interconnection.

The project is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under queue ID ERCOT-28INR0482, and its status is active. It entered the queue on March 29, 2026, and has a proposed commercial operation date of February 16, 2032. The available data does not indicate the status of an interconnection agreement.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Zapata

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Falcon Energy Project

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

8004 Revilla 138 kV

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.