Query
Falcon II Solar
Type
Entity Briefing
Entity
Falcon II Solar
Generated
2026-10-19T14:38:51.783Z

Briefing on Falcon II Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
100 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-06-24
Proposed COD
Briefing/projectactive

Falcon II Solar is a 100 MW Solar project in Texas, currently active.

Falcon Energy Project is the reported developer. Proposed COD is 2029-06-24.

Queue ID
ERCOT-28INR0482
Location
Zapata, Texas
Technology
Solar
Developer
Falcon Energy Project
Market / region
ERCOT
Point of interconnection
8004 Revilla 138 kV

What stands out

1

Falcon II Solar is a 100 MW Solar project in Texas with status active.

2

Falcon Energy Project is the reported developer.

3

proposed COD is 2029-06-24.

Market and operating context

Queue date
2026-03-29
Proposed COD
2029-06-24

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Falcon II Solar — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0482
LocationZapata, Texas
TechnologySolar
DeveloperFalcon Energy Project
Market / regionERCOT
Point of interconnection8004 Revilla 138 kV
Queue date2026-03-29
Proposed COD2029-06-24