Viento Bravo Wind
366.51 MW generation in Jim Hogg, TX · In queue since October 2025 · Proposed COD July 2028
366.51 MW
Capacity
1
Components
Wind
1y 1m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 9m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-07-06
Projected COD moved
0 times
Jul 2028 → Jul 2028
Net change
0 months
first report to latest
Capacity
367 MW
unchanged in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
ERCOT Standard Generation Interconnection Agreement between Electric Transmission Texas and AES Clean Energy O&M (as agent for Zapata Wind and Viento Bravo Wind), dated Dec 31, 2025 and filed at the PUCT Jan 12, 2026.
interchange.puc.texas.govResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- interchange.puc.texas.gov/Documents/35077_2359_1573371.PDF
- app.nrgmap.com/queues/ercot-28inr0434
- infrasure.ai/project/ercot-28inr0434-viento-bravo-wind
- texas-biz.com/co/webb-wind-llc
- ercotqueue.com/project/28INR0434
Commercial operation date: Every source that gives a COD (infrasure.ai, NRG Map, cleanview) repeats the ERCOT/LBNL proposed date of 2028-07-06. No developer press release or news item independently confirms or changes it.
Developer: The Dec 31, 2025 ERCOT SGIA, filed at the PUCT, names AES Clean Energy Operations & Maintenance, LLC as authorized agent for principals Zapata Wind, LLC and Viento Bravo Wind, LLC. The Texas business registry page for Viento Bravo Wind, LLC sits under the 'webb-wind-llc' slug, which suggests Webb Wind, LLC is the project-LLC filing name. The AES link is inferred from the agent relationship rather than a direct AES announcement.
Status: The PUCT filing shows an executed Standard Generation Interconnection Agreement covering Viento Bravo Wind, LLC, and NRG Map shows an IA date of 2025-12-31 with the queue status still active. Some trackers (ercotqueue.com) still show IA/FIS as pending, so this is a moderate-confidence upgrade from LBNL's status. The interxdata 'operational' label is contradicted by all other sources and was disregarded.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Viento Bravo Wind project is a proposed 366.51 MW wind generation facility in Jim Hogg County, Texas. Developed by Webb Wind, LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-28INR0434. The project entered the interconnection queue on October 3, 2025, and has a proposed commercial operation date of July 6, 2028.
The project has an Interconnection Agreement (IA) date of December 31, 2025. The point of interconnection (POI) is at the Tap 345kV 80220 Cenizo - 80079 Cruce Ckt-1. The project is currently listed as active in the interconnection queue.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Jim Hogg
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Webb Wind, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 80220 Cenizo - 80079 Cruce Ckt-1
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Cenizo Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Max 4 Wind
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.