Ouroboros Grid BESS 4 (ERCOT-28INR0427) — Project Summary

Queue ID
ERCOT-28INR0427
Capacity
201.14 MW
Technology
Battery
Status
active
Location
Cameron, TX
Region
ERCOT
Developer
Ouroboros Grid BESS Unit 4
IA Status
—

Ouroboros Grid BESS 4

ERCOT-28INR0427BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

201.14 MW hybrid in Cameron, TX · In queue since August 2025 · Proposed COD June 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

201.14 MW

Capacity

0

Components

1y 3m

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 10m

Pre-Study0%
Queue EntryAug 18, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-01

Queue history
28INR0427 · 7 monthly ERCOT reports, Mar 2026 – Sep 2026

Projected COD moved

1 time

Jun 2028 → Jun 2029

Net change

+12 months

first report to latest

Capacity

201 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 18, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jun 1, 2028
Differs from queue: Jun 1, 2029From queue filing
Developer in saved assessment
Ouroboros Grid BESS Unit 4
From queue filing
Status at research time
Active
Active — queue position secured as of August 2025, no public construction or financing announcements found
Financing
Not recorded

Milestones in this assessment

IA executedAug 2025Latest in this assessment

Entered ERCOT interconnection queue

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of June 2028. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL lists 'Ouroboros Grid BESS Unit 4' as developer. No search results found to identify parent company or confirm if this is a project LLC versus operating entity.

Status: LBNL status shows active queue position. Absence of news coverage suggests early-stage development with no major milestones publicly announced yet.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Ouroboros Grid BESS 4 is a proposed battery energy storage development project located in Cameron County, Texas. The project has a total capacity of 201.14 MW and is classified as a hybrid project. Its technology components are listed as battery energy storage and an additional component categorized as "Other." The developer of record is Ouroboros Grid BESS Unit 4. The project is planned to connect to the grid at the 79500 Palmito 345 kV point of interconnection.

The project is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under queue ID ERCOT-28INR0427. It entered the queue on August 18, 2025, and its status is active. The proposed commercial operation date is June 1, 2029. The available data does not indicate the status of an interconnection agreement.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Cameron

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Ouroboros Grid BESS Unit 4

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

79500 Palmito 345kV

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Palmito Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.