Query
Unit 4
Type
Entity Briefing
Entity
Unit 4
Generated
2026-10-20T03:59:35.165Z

Briefing on Unit 4

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
1 MW
Capacity
Operating
Current status
1993
Operating since
1
Generators
17.4%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Unit 4 is a 1 MW Conventional Hydroelectric asset in Utah, currently Operating.

Unit 4 is reported in Utah since 1993 under City of Mt Pleasant - (UT). Available operating and financial measures include 17.4% capacity factor and 2 GWh annual generation; $2294/kW reported CapEx.

Location
Sanpete, Utah
Technology
Conventional Hydroelectric
Owner / parent
City of Mt Pleasant - (UT)
Operator
City of Mt Pleasant - (UT)
Grid
PacifiCorp - East
Plant ID
7015

What stands out

1

Unit 4 is a 1 MW Conventional Hydroelectric asset in Utah with status Operating.

2

Latest annual operating measures report 17.4% capacity factor and 2 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

4

Latest linked story: “U.S. Data Center Power Consumption Map by State (2026)” (ElectricChoice.com, 2026-07-04).

Market and operating context

Balancing authority
PacifiCorp - East
NERC region
WECC
State rank
#24 of 30
National rank
#1366 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.