1.3 MW Hydro operating in Sanpete, UT
1.3 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1993
Operating Since
Coordinates
39.5441, -111.4187
County
Sanpete, UT
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Mt Pleasant - (UT) | — | — |
| Owner(s) | City of Mt Pleasant - (UT) | — | — |
| Status | Operating | — | — |
Unit 4 is a hydroelectric power plant located in Sanpete County, Utah. The plant, which began operating in 1993, has a total capacity of 1.3 MW and consists of a single generator utilizing conventional hydroelectric technology. It is owned and operated by the City of Mt Pleasant, Utah.
The plant's primary fuel source is water (WAT). In the most recent year of reported data, Unit 4 generated 1,985 MWh of electricity, achieving a capacity factor of 17.4%. The plant operates within the PacifiCorp - East balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Unit 4 is ranked as the 25th largest power plant in Utah out of 30, and nationally it is ranked 1,366 out of 1,464 plants.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - East (PACE)
Grid Voltage
2.4 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
0 MWh
Latest Month
2.0K MWh
Annual Generation
17.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $3.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Unit 4Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.