Prairie Branch Solar
301.14 MW hybrid in Montague, TX · In queue since September 2025 · Proposed COD December 2029
301.14 MW
Capacity
1
Components
Solar
1y 2m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 3m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-12-01
Projected COD moved
1 time
Jun 2028 → Dec 2029
Net change
+18 months
first report to latest
Capacity
301 → 301 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- infrasure.ai/project/ercot-28inr0422-prairie-branch-solar
- interconnection.fyi/project/ercot-28inr0422
- cleanview.co/power-projects/planned/solar-farms/texas/28INR0422/prairie-branch-solar
- cleanview.co/planned-solar-projects/TX/28INR0422/prairie-branch-solar
- app.nrgmap.com/queues/ercot-28inr0422
Commercial operation date: The LBNL/ERCOT queue date is 2029-12-01, and interconnection.fyi and the structured Infrasure data repeat it. Cleanview (one page) and Infrasure's prose cite June 2028, but these are queue-derived aggregators rather than developer or financing-backed signals, so they don't override the queue date.
Developer: The LBNL developer field just repeats the project name. interconnection.fyi lists the owner as 'Prairie Branch Energy, LLC', which is another project shell, and no source names a parent or operating company.
Status: LBNL, NRG Map, Infrasure and interconnection.fyi all show the queue entry as active with IA not executed. The single 'operational' label on interxdata conflicts with every other source and is not credible for a project queued in September 2025.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Prairie Branch Solar is a proposed 301.14 MW solar photovoltaic generation project located in Montague County, Texas. The project, developed by Prairie Branch Solar, is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0422, with a queue entry date of September 9, 2025. The proposed commercial operation date is June 24, 2028.
The project is planned to connect to the grid at the Tap 345kV #1730 Krum West - #6111 Riley Ckt 1 point of interconnection. The Prairie Branch Solar project has been mentioned in recent industry news.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Montague
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Prairie Branch Solar
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV #1730 Krum West - #6111 Riley Ckt 1
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.