Alkali Creek Wind (ERCOT-28INR0415) — Project Summary

Queue ID
ERCOT-28INR0415
Capacity
474.4 MW
Technology
Wind
Status
active
Location
Fisher, TX
Region
ERCOT
Developer
Alkali Creek Wind, LLC
IA Status
Facility Study

Alkali Creek Wind

ERCOT-28INR0415BetaActiveWindERCOTLBNL + Live

474.4 MW generation in Fisher, TX · In queue since August 2025 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

474.4 MW

Capacity

1

Components

Wind

1y 3m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 4m

Facilities Study50%
Queue EntryAug 18, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

Queue history
28INR0415 · 15 monthly ERCOT reports, Jul 2025 – Sep 2026

Projected COD moved

0 times

Dec 2028 → Dec 2028

Net change

0 months

first report to latest

Capacity

474 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 18, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 1, 2028
From queue filing
Developer in saved assessment
Alkali Creek Wind, LLC
From queue filing
Status at research time
Active
Active in ERCOT queue at Facility Study stage; no IA executed, no public construction or financing signals. One aggregator (interxdata) labels it 'operational', which contradicts LBNL and is disregarded.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-28inr0415
  2. infrasure.ai/project/ercot-28inr0415-alkali-creek-wind
  3. cleanview.co/power-projects/planned/wind-farms/texas/28INR0415/alkali-creek-wind
  4. ercotqueue.com/developer/alkali-creek-wind-llc

Commercial operation date: Only the LBNL proposed COD (2028-12-01) exists. Aggregator sites (interconnection.fyi, cleanview.co) repeat the same queue-derived date and are not independent developer-backed signals, and no press releases or news were found.

Developer: Only the LBNL filing entity (Alkali Creek Wind, LLC) appears, repeated by queue trackers. No parent or operating company was identified in any source.

Status: LBNL lists the project as active with a Facility Study IA status and is_operational false. Cleanview describes it as planned, and the interxdata 'operational' label looks like an aggregator error.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Alkali Creek Wind project is a proposed 474.4 MW wind generation facility in Fisher County, Texas. The project, developed by Alkali Creek Wind, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0415, with a queue entry date of August 18, 2025. The proposed commercial operation date is December 1, 2028.

The project's point of interconnection is Tap 345 kV BUS #1048 Tonkawa - BUS #11050 Dusty Road. Recent news coverage has discussed the development project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Fisher

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Alkali Creek Wind, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV BUS #1048 Tonkawa - BUS #11050 Dusty Road

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.