Cowboy Power Gas Plant (ERCOT-28INR0353) — Project Summary

Queue ID
ERCOT-28INR0353
Capacity
251.53 MW
Technology
Gas
Status
active
Location
San Patricio, TX
Region
ERCOT
Developer
Vaquero Power, LLC
IA Status
Facility Study

Cowboy Power Gas Plant

ERCOT-28INR0353BetaActiveGasERCOTLBNL

251.53 MW generation in San Patricio, TX · In queue since August 2025 · Proposed COD October 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

251.53 MW

Capacity

1

Components

Gas

1y 3m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 2m

Facilities Study50%
Queue EntryAug 18, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-10-16

Queue history
28INR0353 · 8 monthly ERCOT reports, Aug 2025 – Mar 2026

Projected COD moved

0 times

Oct 2028 → Oct 2028

Net change

0 months

first report to latest

Capacity

252 MW

unchanged in the reports

Latest stage

Cancelled

last listed Mar 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 18, 2025
CancelledApr 17, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest activitypartnershipConstruction Review · 2025-12-08

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Oct 16, 2028
From queue filing
Developer in saved assessment
Vaquero Power, LLC
From queue filing
Status at research time
Active
Active — in Facility Study phase per ERCOT queue, no public construction or financing announcements
Financing
Not recorded

Milestones in this assessment

IA executedAug 2025Latest in this assessment

Entered ERCOT queue for 251.53 MW gas facility in San Patricio County

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of October 2028. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL lists 'Vaquero Power, LLC' as developer. No news coverage or corporate announcements found to confirm whether this is an operating company or project-specific LLC, or to identify any parent entity.

Status: LBNL status shows 'active' with IA status at Facility Study stage. No news coverage found to indicate project progression beyond interconnection studies.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Cowboy Power Gas Plant is a proposed 251.53 MW gas-fired generation project in San Patricio County, Texas. Developed by Vaquero Power, LLC, the project consists of internal combustion technology and is located within the ERCOT region. It entered the ERCOT interconnection queue as project ERCOT-28INR0353 on August 18, 2025, with a proposed commercial operation date of October 16, 2028.

The Cowboy Power Gas Plant development has been the subject of recent news coverage, with eight articles appearing in industry, regulatory, and deals categories.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Mar 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

San Patricio

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Vaquero Power, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 8249 Angstrom - 8624 Grissom

Data Source

LBNL

PartnerBasin Electric Power CooperativeConstruction Review · 2025-12-08
CompanyNextEra Energy ResourcesConstruction Review · 2025-12-08
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Angstrom Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.