Cowboy Power Gas Plant is a 252 MW Gas project in Texas, currently active.
Vaquero Power, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-16.
- Queue ID
- ERCOT-28INR0353
- Location
- San Patricio, Texas
- Technology
- Gas
- Developer
- Vaquero Power, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 8249 Angstrom - 8624 Grissom
What stands out
Cowboy Power Gas Plant is a 252 MW Gas project in Texas with status active.
Vaquero Power, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-10-16.
Latest linked story: “Scope on the 1,450-MW River Run Energy Center by NextEra and Basin for North Dakota’s Data Centers Boom” (Construction Review, 2025-12-08).
Market and operating context
- Queue date
- 2025-08-18
- Proposed COD
- 2028-10-16
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.