18-BRAVO BESS
407 MW storage in Hunt, TX · In queue since April 2025 · Proposed COD February 2028
407 MW
Capacity
1
Components
Battery
1y 7m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 10m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-02-01
Projected COD moved
0 times
Feb 2028 → Feb 2028
Net change
0 months
first report to latest
Capacity
407 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- infrasure.ai/project/ercot-28inr0327-18-bravo-bess
- cleanview.co/power-projects/planned/battery-storage-projects/texas/28INR0327/18-bravo-bess
- interconnection.fyi/project/ercot-28inr0327
- app.nrgmap.com/queues/ercot-28inr0327
Commercial operation date: No news or press-release source gives a different date. Aggregator pages (Cleanview: 'Expected online 2028'; infrasure.ai: 'Proposed COD: 2028-02-01') only repeat the ERCOT/LBNL filing, so they are not independent confirmation.
Developer: Only the LBNL filing and aggregators derived from it name Scout Energy Management, LLC. No press release or news confirms the operating company or any parent or ownership change. The news results about Energy Vault, Jupiter Power and Fermi America are unrelated to this project.
Status: LBNL lists the project as active, and the aggregators (Grid Status, NRG Map, interconnection.fyi) agree. No evidence of withdrawal, suspension or construction start.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The 18-BRAVO BESS project is a proposed 407 MW hybrid battery energy storage system located in Hunt County, Texas. Developed by Scout Energy Management, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0327, with a queue entry date of April 1, 2025. The proposed commercial operation date is February 1, 2028.
The project's point of interconnection is the 138 kV Commerce Switch Substation, Bus no. #1816. The 18-BRAVO BESS project has appeared in recent news coverage regarding energy storage development in the ERCOT region.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Hunt
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Scout Energy Management, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
138 kV Commerce Switch Substation. Bus no. #1816
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
18-BRAVO BESS
Data-driven briefing on 18-BRAVO BESS — fleet, generation, financial, and news signals.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.