Miracle Ranch Solar SLF
221.6 MW hybrid in Webb, TX · In queue since February 2025 · Proposed COD June 2028
221.6 MW
Capacity
1
Components
Solar
1y 5m
In Queue
Facility Study
IA Phase
COD target: 2028
Total Duration
3y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-30
Entered ERCOT interconnection queue in Facility Study phase
Proposed commercial operation date per ERCOT queue filing
The Miracle Ranch Solar SLF is a proposed 221.6 MW solar generation project located in Webb County, Texas. Developed by Miracle Ranch LLC, the project is interconnected within the ERCOT region and entered the ERCOT interconnection queue as project number ERCOT-28INR0272 on February 25, 2025. The proposed commercial operation date is June 30, 2028.
The project utilizes photovoltaic solar technology. The point of interconnection is the 138kV North Laredo to Barrera line operated by AEP. The project is currently listed as active in the interconnection queue.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Webb
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Miracle Ranch LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
138kV North Laredo (8909_NLARSW4A) to Barrera (8717_BARRERA4A) - AEP
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Miracle Ranch Solar SLFForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.