Briefing/projectactive
Miracle Ranch Solar SLF is a 222 MW Solar+Battery project in Texas, currently active.
Miracle Ranch LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-30.
- Queue ID
- ERCOT-28INR0272
- Location
- Webb, Texas
- Technology
- Solar+Battery
- Developer
- Miracle Ranch LLC
- Market / region
- ERCOT
- Point of interconnection
- 138kV North Laredo (8909_NLARSW4A) to Barrera (8717_BARRERA4A) - AEP
What stands out
1
Miracle Ranch Solar SLF is a 222 MW Solar+Battery project in Texas with status active.
2
Miracle Ranch LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-06-30.
Market and operating context
- Queue date
- 2025-02-25
- Proposed COD
- 2028-06-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.