Briefing on Miracle Ranch Solar SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
222 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-06-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Miracle Ranch Solar SLF is a 222 MW Solar+Battery project in Texas, currently active.

Miracle Ranch LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-30.

Queue ID
ERCOT-28INR0272
Location
Webb, Texas
Technology
Solar+Battery
Developer
Miracle Ranch LLC
Market / region
ERCOT
Point of interconnection
138kV North Laredo (8909_NLARSW4A) to Barrera (8717_BARRERA4A) - AEP

What stands out

1

Miracle Ranch Solar SLF is a 222 MW Solar+Battery project in Texas with status active.

2

Miracle Ranch LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-06-30.

Market and operating context

Queue date
2025-02-25
Proposed COD
2028-06-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Miracle Ranch Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0272
LocationWebb, Texas
TechnologySolar+Battery
DeveloperMiracle Ranch LLC
Market / regionERCOT
Point of interconnection138kV North Laredo (8909_NLARSW4A) to Barrera (8717_BARRERA4A) - AEP
Queue date2025-02-25