Badger Solar
301.83 MW hybrid in Upton, TX · In queue since February 2025 · Proposed COD May 2029
301.83 MW
Capacity
1
Components
Solar
1y 9m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 3m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-05-25
Projected COD moved
1 time
Dec 2028 → May 2029
Net change
+5 months
first report to latest
Capacity
302 → 280 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (2 recorded sources)
low confidence at research time
- infrasure.ai/project/ercot-28inr0212-badger-solar
- cleanview.co/power-projects/planned/solar-farms/texas/28INR0212/badger-solar
Commercial operation date: Only the LBNL/ERCOT queue date (2029-05-25) exists. The Cleanview ('Expected online 2029') and Infrasure ('Proposed COD: 2029-05-25') pages appear to be derived from the same queue data, so they are not independent confirmation. No developer press release or news item gives a different target.
Developer: Infrasure repeats the LBNL filing entity, '174 Power Global Properties, LLC', as developer. No independent press release or news source confirms a parent company or an ownership change. The entity is likely tied to 174 Power Global (Hanwha), but the sources provided do not verify that.
Status: LBNL lists the project as active, and the Infrasure listing agrees (Facility Study, IA not yet executed). No sources suggest withdrawal or construction. The Sun Badger Solar news results concern an unrelated Wisconsin residential installer and were disregarded.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Badger Solar is a proposed 301.83 MW solar photovoltaic generation project located in Upton County, Texas. Developed by 174 Power Global Properties, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0212, with a queue entry date of February 12, 2025. The proposed commercial operation date is May 25, 2029.
The point of interconnection for Badger Solar is the 345 kV North McCamey Substation (Bus# 76000). The project is listed as a generation project in the ERCOT queue.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Upton
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
174 Power Global Properties, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
345 kV North McCamey Substation (Bus# 76000)
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- McCamey Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.