Gypsum Plains Solar
503.12 MW hybrid in Ector, TX · In queue since June 2025 · Proposed COD June 2029
503.12 MW
Capacity
1
Components
Solar
1y 5m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4 years
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-21
Projected COD moved
3 times
Jan 2029 → Jun 2029
Net change
+5 months
first report to latest
Capacity
500 → 503 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- infrasure.ai/project/ercot-28inr0205-gypsum-plains-solar
- cleanview.co/power-projects/planned/solar-farms/texas/28INR0205/gypsum-plains-solar
- interconnection.fyi/project/ercot-28inr0205
- ercotqueue.com/developer/gypsum-plains-solar-llc
- bizapedia.com/tx/gypsum-plains-solar-llc.html
Commercial operation date: Only queue-derived data exists. Aggregators (infrasure, interconnection.fyi, cleanview) repeat the ERCOT filing date of ~June 2029 and 'Expected online 2029', and none is an independent developer-backed target.
Developer: All sources name only the project LLC (registered in Austin, TX). No press release or corporate announcement identifies a parent or operating company. The LLC has 4 projects in the ERCOT queue.
Status: LBNL lists the project as active, and aggregators (infrasure.ai, interconnection.fyi) agree. No evidence of withdrawal, IA execution, or construction was found.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Gypsum Plains Solar project is a proposed 503.12 MW solar generation facility in Ector County, Texas. Developed by Gypsum Plains Solar, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0205, with a queue entry date of June 5, 2025. The proposed commercial operation date is June 21, 2029.
The project will interconnect to the ERCOT grid at the Tap 345kV line Wolf BUS# 11010 - Reiter BUS#18544. The technology used will be photovoltaic solar. The project has appeared in recent news.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Ector
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Gypsum Plains Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kv line Wolf BUS# 11010 - Reiter BUS#18544
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.