Star Grass Renewable Energy Solar SLF (ERCOT-28INR0195) — Project Summary

Queue ID
ERCOT-28INR0195
Capacity
150 MW
Technology
Solar+Battery
Status
active
Location
Eastland, TX
Region
ERCOT
Developer
Star Grass Renewable Energy LLC
IA Status
Facility Study

Star Grass Renewable Energy Solar SLF

ERCOT-28INR0195BetaActiveSolarBatteryERCOTLBNL + Live

150 MW hybrid in Eastland, TX · In queue since February 2025 · Proposed COD September 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

150 MW

Capacity

1

Components

Solar

1y 5m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Status
as of 20 months ago
Latest milestoneCOD achievedSolar Power World · 2024-11-22
Interconnection

Total Duration

4y 7m

Facilities Study50%
Queue EntryFeb 14, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-09-14

Cross-source intelligence
Beta
Low confidence·0 sources·as of 2026-06-01
Expected COD
2029-09-14
From queue filing
Developer
Star Grass Renewable Energy LLC
From queue filing
Status
Active
Active — Facility Study stage in ERCOT queue as of February 2025, no construction timeline announced
Financing
Unannounced
Key milestones
IA executedFeb 14, 2025Most recent

Entered ERCOT interconnection queue at Facility Study stage

About

Star Grass Renewable Energy Solar is a proposed 150 MW solar generation project located in Eastland County, Texas. The project, developed by Star Grass Renewable Energy LLC, is listed in the ERCOT interconnection queue as entry ERCOT-28INR0195. It has a proposed commercial operation date of September 14, 2029, and its interconnection status is currently in the Facility Study phase.

The proposed project consists of 150 MW of solar photovoltaic generation. It is listed as active in the ERCOT interconnection queue. Recent news coverage has discussed the project's development.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Eastland

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Star Grass Renewable Energy LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 6310 Putnam - 3378 Carbon_8

Data Source

LBNL + Live

DeveloperScout Clean EnergySolar Power World · 2024-11-22
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Putnam Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles

No Ask reports yet for this entity.

Ask about Star Grass Renewable Energy Solar SLF
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.