Ponferrada Solar (ERCOT-28INR0182) — Project Summary

Queue ID
ERCOT-28INR0182
Capacity
148.87 MW
Technology
Solar
Status
active
Location
Navarro, TX
Region
ERCOT
Developer
Karol Solar VI
IA Status
Facility Study

Ponferrada Solar

ERCOT-28INR0182BetaActiveSolarERCOTLBNL + Live

148.87 MW generation in Navarro, TX · In queue since October 2024 · Proposed COD April 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

148.87 MW

Capacity

1

Components

Solar

2y 1m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 6m

Facilities Study50%
Queue EntryOct 1, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-04-06

Queue history
28INR0182 · 18 monthly ERCOT reports, Apr 2025 – Sep 2026

Projected COD moved

1 time

Nov 2028 → Apr 2029

Net change

+5 months

first report to latest

Capacity

149 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 1, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Apr 6, 2029
From queue filing
Developer in saved assessment
Karol Solar VI
From queue filing
Status at research time
Active
Active — early-stage Facility Study phase, no public construction timeline or financing announcements
Financing
Not recorded

Milestones in this assessment

IA executedLatest in this assessment

Facility Study phase — IA not yet executed per LBNL queue status

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of April 2029. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing identifies 'Karol Solar VI' as developer. No public news, corporate website, or press releases found to confirm parent company or operating entity behind this project-specific name.

Status: LBNL shows 'active' status in Facility Study phase (no IA executed yet). Zero public news coverage suggests pre-development stage with no major milestones achieved.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Ponferrada Solar is a proposed 148.87 MW solar generation project in Navarro County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The development project is being advanced by Karol Solar VI and consists of a single solar component with a capacity of 148.87 MW. It is identified in the ERCOT interconnection queue under the ID ERCOT-28INR0182.

The project entered the ERCOT interconnection queue on October 1, 2024, and holds an active status. Its interconnection agreement status is listed as Facility Study, indicating that it is undergoing detailed technical evaluation of its grid connection requirements. The proposed point of interconnection is a tap on the 138 kV line between the 3456 CORSWEST1_8 and 3457 CORS_MOBT_8 buses. The project's proposed commercial operation date is April 6, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Navarro

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Karol Solar VI

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138 KV 3456 CORSWEST1_8 - 3457 CORS_MOBT_8

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.