Query
Ponferrada Solar
Type
Entity Briefing
Entity
Ponferrada Solar
Generated
2026-10-19T13:27:42.949Z

Briefing on Ponferrada Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
149 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-04-06
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Ponferrada Solar is a 149 MW Solar project in Texas, currently active.

Karol Solar VI is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-06.

Queue ID
ERCOT-28INR0182
Location
Navarro, Texas
Technology
Solar
Developer
Karol Solar VI
Market / region
ERCOT
Point of interconnection
Tap 138 KV 3456 CORSWEST1_8 - 3457 CORS_MOBT_8

What stands out

1

Ponferrada Solar is a 149 MW Solar project in Texas with status active.

2

Karol Solar VI is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-04-06.

Market and operating context

Queue date
2024-10-01
Proposed COD
2029-04-06
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Ponferrada Solar — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0182
LocationNavarro, Texas
TechnologySolar
DeveloperKarol Solar VI
Market / regionERCOT
Point of interconnectionTap 138 KV 3456 CORSWEST1_8 - 3457 CORS_MOBT_8
Queue date2024-10-01
Proposed COD2029-04-06