Sisters Solar II (ERCOT-28INR0177) — Project Summary

Queue ID
ERCOT-28INR0177
Capacity
205.54 MW
Technology
Solar+Battery
Status
active
Location
Ector, TX
Region
ERCOT
Developer
Oberon Solar III, LLC
IA Status
Facility Study

Sisters Solar II

ERCOT-28INR0177BetaActiveSolarBatteryERCOTLBNL + Live

205.54 MW hybrid in Ector, TX · In queue since October 2024 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

205.54 MW

Capacity

1

Components

Solar

2y 1m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 2m

Facilities Study50%
Queue EntryOct 21, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-15

Queue history
28INR0177 · 24 monthly ERCOT reports, Oct 2024 – Sep 2026

Projected COD moved

0 times

Dec 2028 → Dec 2028

Net change

0 months

first report to latest

Capacity

202 → 206 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 21, 2024
Facilities study approvedMar 27, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 15, 2028
From queue filing
Developer in saved assessment
Oberon Solar III, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, queue entry October 2024, no public construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedOct 2024Latest in this assessment

Entered ERCOT queue at Facility Study stage

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of December 2028. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity 'Oberon Solar III, LLC' is available. No news coverage or corporate announcements found to identify a parent operating company or confirm if this is a project-specific shell LLC.

Status: LBNL status shows 'active' in Facility Study phase as of October 2024 queue entry. No contradicting information or project updates found in public sources.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Sisters Solar II is a proposed solar generation project located in Ector County, Texas, within the ERCOT region. The project, developed by Oberon Solar III, LLC, has a total capacity of 205.54 MW. It consists entirely of solar photovoltaic generation.

The project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0177, with a queue entry date of October 21, 2024. Its proposed commercial operation date is December 15, 2028, and its interconnection agreement status is currently in the Facility Study phase. The point of interconnection is at the tap 345kV 11010 Wolf Switching Station - 10012 Meteor. The project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Oberon Solar III, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 11010 Wolf Switching Station - 10012 Meteor

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
WHCCS2_CC2
POI Substation
Wolf Hollow Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.