Query
Sisters Solar II
Type
Entity Briefing
Entity
Sisters Solar II
Generated
2026-10-19T17:40:31.590Z

Briefing on Sisters Solar II

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
206 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-12-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Sisters Solar II is a 206 MW Solar+Battery project in Texas, currently active.

Oberon Solar III, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-15.

Queue ID
ERCOT-28INR0177
Location
Ector, Texas
Technology
Solar+Battery
Developer
Oberon Solar III, LLC
Market / region
ERCOT
Point of interconnection
tap 345kV 11010 Wolf Switching Station - 10012 Meteor

What stands out

1

Sisters Solar II is a 206 MW Solar+Battery project in Texas with status active.

2

Oberon Solar III, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-15.

Market and operating context

Queue date
2024-10-21
Proposed COD
2028-12-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Sisters Solar II — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0177
LocationEctor, Texas
TechnologySolar+Battery
DeveloperOberon Solar III, LLC
Market / regionERCOT
Point of interconnectiontap 345kV 11010 Wolf Switching Station - 10012 Meteor
Queue date2024-10-21
Proposed COD2028-12-15