South Tripoint BESS (ERCOT-28INR0150) — Project Summary

Queue ID
ERCOT-28INR0150
Capacity
204.5 MW
Technology
Battery
Status
active
Location
Fayette, TX
Region
ERCOT
Developer
South Triangle Energy, LLC
IA Status
Facility Study

South Tripoint BESS

ERCOT-28INR0150BetaActiveBatteryERCOTLBNL + Live

204.5 MW storage in Fayette, TX · In queue since December 2024 · Proposed COD May 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

204.5 MW

Capacity

1

Components

Battery

1y 11m

In Queue

Facility Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 5m

Facilities Study50%
Queue EntryDec 19, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-05-30

Queue history
28INR0150 · 11 monthly ERCOT reports, Nov 2025 – Sep 2026

Projected COD moved

0 times

May 2030 → May 2030

Net change

0 months

first report to latest

Capacity

205 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 19, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
May 30, 2030
From queue filing
Developer in saved assessment
South Triangle Energy, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage per ERCOT queue, no public construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedDec 19, 2024Latest in this assessment

Entered ERCOT interconnection queue at Facility Study stage

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of May 2030. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing identifies South Triangle Energy, LLC as developer. No public corporate information, press releases, or news coverage found to confirm parent company structure or validate this entity.

Status: LBNL shows active status in Facility Study phase as of December 2024 queue entry. No news coverage or developer announcements found to provide additional status context.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

South Tripoint BESS is a proposed battery energy storage development project located in Fayette County, Texas. Developed by South Triangle Energy, LLC, the project has a planned capacity of 204.5 megawatts (MW), consisting entirely of battery storage. It is designed to connect to the grid at the 7286 L_FAYETT8_1Y 138 kV point of interconnection.

The project is listed in the interconnection queue of the Electric Reliability Council of Texas (ERCOT) under queue ID ERCOT-28INR0150. It entered the queue on December 19, 2024, and currently holds an active status. As of the latest available data, the project is in the Facility Study phase of the interconnection process. Its proposed commercial operation date is May 30, 2030.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Fayette

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

South Triangle Energy, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

7286 L_FAYETT8_1Y 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.