South Tripoint BESS is a 205 MW Battery project in Texas, currently active.
South Triangle Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-05-30.
- Queue ID
- ERCOT-28INR0150
- Location
- Fayette, Texas
- Technology
- Battery
- Developer
- South Triangle Energy, LLC
- Market / region
- ERCOT
- Point of interconnection
- 7286 L_FAYETT8_1Y 138kV
What stands out
1
South Tripoint BESS is a 205 MW Battery project in Texas with status active.
2
South Triangle Energy, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2030-05-30.
Market and operating context
- Queue date
- 2024-12-19
- Proposed COD
- 2030-05-30
- IA status
- Facility Study
- Study phase
- Facility Study