Query
South Tripoint BESS
Type
Entity Briefing
Entity
South Tripoint BESS
ISO/RTO
spp
Technology
battery
Generated
2026-10-19T21:14:37.317Z

Briefing on South Tripoint BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
205 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2030-05-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

South Tripoint BESS is a 205 MW Battery project in Texas, currently active.

South Triangle Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-05-30.

Queue ID
ERCOT-28INR0150
Location
Fayette, Texas
Technology
Battery
Developer
South Triangle Energy, LLC
Market / region
ERCOT
Point of interconnection
7286 L_FAYETT8_1Y 138kV

What stands out

1

South Tripoint BESS is a 205 MW Battery project in Texas with status active.

2

South Triangle Energy, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2030-05-30.

Market and operating context

Queue date
2024-12-19
Proposed COD
2030-05-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

South Tripoint BESS — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0150
LocationFayette, Texas
TechnologyBattery
DeveloperSouth Triangle Energy, LLC
Market / regionERCOT
Point of interconnection7286 L_FAYETT8_1Y 138kV
Queue date2024-12-19
Proposed COD2030-05-30