Biggs BESS (ERCOT-28INR0110) — Project Summary

Queue ID
ERCOT-28INR0110
Capacity
200 MW
Technology
Solar+Battery
Status
active
Location
Mcculloch, TX
Region
ERCOT
Developer
Biggs Battery Facility, LLC
IA Status
Facility Study

Biggs BESS

ERCOT-28INR0110BetaActiveBatteryBatteryERCOTLBNL + Live

200 MW generation in Mcculloch, TX · In queue since July 2024 · Proposed COD June 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

200 MW

Capacity

1

Components

Battery

2y 4m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 11m

Facilities Study50%
Queue EntryJul 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-16

Queue history
28INR0110 · 18 monthly ERCOT reports, Apr 2025 – Sep 2026

Projected COD moved

1 time

Nov 2028 → Jun 2029

Net change

+7 months

first report to latest

Capacity

200 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 22, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Nov 15, 2028
Differs from queue: Jun 16, 2029From queue filing
Developer in saved assessment
Biggs Battery Facility, LLC
From queue filing
Status at research time
Active
Active — early-stage project in Facility Study phase, queued July 2024
Financing
Not recorded

Milestones in this assessment

IA executedJul 2024Latest in this assessment

Entered ERCOT interconnection queue, Facility Study phase

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of November 2028. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity 'Biggs Battery Facility, LLC' is known. No press releases or corporate announcements found to identify a parent operating company or confirm this is a project-specific LLC.

Status: LBNL shows Active status with Facility Study phase initiated in July 2024. No news coverage found to indicate construction activity, financing, or status changes.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Biggs BESS (queue ID ERCOT-28INR0110) is a proposed energy storage development project in McCulloch County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Biggs Battery Facility, LLC and has a total proposed capacity of 200 MW. Although its queue record classifies the technology as Solar+Battery, the only component listed is a 200 MW battery energy storage system, and no solar capacity is specified. The project is categorized as a generation project and would connect to the grid at the 76006 Bow Wood 345 kV point of interconnection.

The project entered the ERCOT interconnection queue on July 22, 2024, and its queue status is listed as active. It is in the Facility Study phase of the interconnection process, meaning an interconnection agreement has not yet been executed. The proposed commercial operation date is June 16, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Mcculloch

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Biggs Battery Facility, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

76006 Bow Wood 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Bow Wood Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.