Query
Biggs BESS
Type
Entity Briefing
Entity
Biggs BESS
State
TN
Technology
battery
Generated
2026-10-19T14:23:34.797Z

Briefing on Biggs BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
200 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-11-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Biggs BESS is a 200 MW Solar+Battery project in Texas, currently active.

Biggs Battery Facility, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-11-15.

Queue ID
ERCOT-28INR0110
Location
Mcculloch, Texas
Technology
Solar+Battery
Developer
Biggs Battery Facility, LLC
Market / region
ERCOT
Point of interconnection
76006 Bow Wood 345 kV

What stands out

1

Biggs BESS is a 200 MW Solar+Battery project in Texas with status active.

2

Biggs Battery Facility, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-11-15.

Market and operating context

Queue date
2024-07-22
Proposed COD
2028-11-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Biggs BESS — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0110
LocationMcculloch, Texas
TechnologySolar+Battery
DeveloperBiggs Battery Facility, LLC
Market / regionERCOT
Point of interconnection76006 Bow Wood 345 kV
Queue date2024-07-22
Proposed COD2028-11-15