Starlit Pasture Storage (ERCOT-28INR0095) — Project Summary

Queue ID
ERCOT-28INR0095
Capacity
208.8 MW
Technology
Battery
Status
active
Location
Washington, TX
Region
ERCOT
Developer
Starlit Pasture Energy Center, LLC
IA Status
Facility Study

Starlit Pasture Storage

ERCOT-28INR0095BetaActiveBatteryERCOTLBNL

208.8 MW storage in Washington, TX · In queue since August 2024 · Proposed COD September 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

208.8 MW

Capacity

1

Components

Battery

2y 3m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 1m

Facilities Study50%
Queue EntryAug 16, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-09-30

Queue history
28INR0095 · 26 monthly ERCOT reports, Jun 2024 – Jul 2026

Projected COD moved

1 time

Sep 2028 → Sep 2029

Net change

+12 months

first report to latest

Capacity

209 MW

unchanged in the reports

Latest stage

Cancelled

last listed Jul 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 16, 2024
CancelledAug 27, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Jul 2026 queue source. See the queue record for reported project facts.

Research COD
Sep 30, 2029
From queue filing
Developer in saved assessment
Starlit Pasture Energy Center, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, queue entry August 2024, no construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedAug 2024Latest in this assessment

Entered ERCOT queue, Facility Study stage initiated

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of 2029-09-30. No independent news or press releases found to validate or contradict this date.

Developer: Only LBNL filing entity available. No press releases or corporate announcements found to identify a parent operating company. The LLC naming pattern suggests this may be a project-specific entity, but no parent company could be confirmed.

Status: LBNL status shows Active with Facility Study in progress. Queue date of August 2024 indicates very early-stage project with no public development milestones yet announced.

About

Saved background

Generated Apr 10, 2026 · Predates Jul 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Starlit Pasture Storage project is a proposed 208.8 MW battery storage development in Washington County, Texas. The project is being developed by Starlit Pasture Energy Center, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0095, with a queue entry date of August 16, 2024.

The proposed commercial operation date for the Starlit Pasture Storage project is September 30, 2029. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 7574 Chappell Hill 138 KV.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jul 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Washington

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Starlit Pasture Energy Center, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

7574 Chappell Hill 138 KV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.