Briefing on Starlit Pasture Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
209 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Starlit Pasture Storage is a 209 MW Battery project in Texas, currently active.

Starlit Pasture Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-30.

Queue ID
ERCOT-28INR0095
Location
Washington, Texas
Technology
Battery
Developer
Starlit Pasture Energy Center, LLC
Market / region
ERCOT
Point of interconnection
7574 Chappell Hill 138 KV

What stands out

1

Starlit Pasture Storage is a 209 MW Battery project in Texas with status active.

2

Starlit Pasture Energy Center, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-09-30.

Market and operating context

Queue date
2024-08-16
Proposed COD
2029-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Starlit Pasture Storage — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0095
LocationWashington, Texas
TechnologyBattery
DeveloperStarlit Pasture Energy Center, LLC
Market / regionERCOT
Point of interconnection7574 Chappell Hill 138 KV
Queue date2024-08-16
Proposed COD2029-09-30