Briefing/projectactive
Starlit Pasture Storage is a 209 MW Battery project in Texas, currently active.
Starlit Pasture Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-30.
- Queue ID
- ERCOT-28INR0095
- Location
- Washington, Texas
- Technology
- Battery
- Developer
- Starlit Pasture Energy Center, LLC
- Market / region
- ERCOT
- Point of interconnection
- 7574 Chappell Hill 138 KV
What stands out
1
Starlit Pasture Storage is a 209 MW Battery project in Texas with status active.
2
Starlit Pasture Energy Center, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-09-30.
Market and operating context
- Queue date
- 2024-08-16
- Proposed COD
- 2029-09-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.