Bullring Wind 3
190.4 MW generation in Starr, TX · In queue since May 2024 · Proposed COD June 2028
190.4 MW
Capacity
1
Components
Wind
2y 6m
In Queue
IA Executed
IA Phase
Signed Nov 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
1y 6m
IA → COD
2y 7m
Total Duration
1y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 18–36 months
Proposed COD: 2028-06-30
Projected COD moved
0 times
Jun 2028 → Jun 2028
Net change
0 months
first report to latest
Capacity
192 → 190 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed with ERCOT
lbnl_queue_snapshotProposed commercial operation date per queue filing
lbnl_queue_snapshotResearch sources and reasoning (2 recorded sources)
low confidence at research time
- lbnl_queue_snapshot
- environmentamerica.org/texas/center/articles/federal-funds-helping-towns-once-dependent-on-fossil-fuels-switch-to-clean-energy/
Commercial operation date: Only LBNL queue data provides a COD target of June 2028. No independent news sources confirm or contradict this date.
Developer: LBNL lists 'Halcon Wind, LLC' as developer. The news-extracted mention of 'Carter Wind Turbines' appears to be from a general article about federal clean energy funding with low confidence (0.7) and no direct connection to this specific project.
Status: LBNL shows IA executed on 2025-11-03, indicating the project has secured interconnection rights and is progressing through development milestones.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Bullring Wind 3 is a proposed wind generation project located in Starr County, Texas, with a total capacity of 190.4 MW. Developed by ACE DevCo NC LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0039, with a queue entry date of May 9, 2024. The proposed commercial operation date is June 30, 2028, and its interconnection status is currently in the Facility Study phase.
The project consists of 190.4 MW of wind generation capacity. Recent news coverage indicates industry interest in the development.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Starr
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Halcon Wind, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.