Query
Bullring Wind 3
Type
Entity Briefing
Entity
Bullring Wind 3
Technology
wind
Generated
2026-10-19T08:02:06.086Z

Briefing on Bullring Wind 3

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
190 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2028-06-30
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Bullring Wind 3 is a 190 MW Wind project in Texas, currently active.

Halcon Wind, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-06-30.

Queue ID
ERCOT-28INR0039
Location
Starr, Texas
Technology
Wind
Developer
Halcon Wind, LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1

What stands out

1

Bullring Wind 3 is a 190 MW Wind project in Texas with status active.

2

Halcon Wind, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-06-30.

4

Latest linked story: “Federal funds helping towns once dependent on fossil fuels switch to clean energy” (Environment America, 2024-01-09).

Market and operating context

Queue date
2024-05-09
Proposed COD
2028-06-30
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Bullring Wind 3 — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0039
LocationStarr, Texas
TechnologyWind
DeveloperHalcon Wind, LLC
Market / regionERCOT
Point of interconnectionTap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1
Queue date2024-05-09
Proposed COD2028-06-30