Silverton Solar (ERCOT-28INR0023) — Project Summary

Queue ID
ERCOT-28INR0023
Capacity
410 MW
Technology
Solar
Status
active
Location
Briscoe, TX
Region
ERCOT
Developer
NextEra Energy Interconnection Holdings, LLC
IA Status
Facility Study

Silverton Solar

ERCOT-28INR0023BetaActiveSolarERCOTLBNL + Live

410 MW generation in Briscoe, TX · In queue since December 2023 · Proposed COD July 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

410 MW

Capacity

1

Components

Solar

2y 11m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 7m

Facilities Study50%
Queue EntryDec 4, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-01

Queue history
28INR0023 · 30 monthly ERCOT reports, Apr 2024 – Sep 2026

Projected COD moved

0 times

Jul 2029 → Jul 2029

Net change

0 months

first report to latest

Capacity

401 → 410 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 4, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jul 1, 2029
From queue filing
Developer in saved assessment
NextEra Energy
Filed as NextEra Energy Interconnection Holdings, LLC
Status at research time
Active
Active in ERCOT queue at Facility Study stage; no IA date and no public construction, permitting or financing news found.
Financing
Not recorded
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-28inr0023-silverton-solar
  2. interconnection.fyi/project/ercot-28inr0023

Commercial operation date: Only the LBNL snapshot gives a COD (2029-07-01). The infrasure.ai page repeats the same date, but it is a queue aggregator and not an independent post-LBNL signal. No press release or news article gives a different target.

Developer: The LBNL filing entity, 'NextEra Energy Interconnection Holdings, LLC', is clearly a NextEra Energy affiliate. The parent is inferred from the entity name, and no search result confirms project-specific developer activity.

Status: LBNL lists the project as active, and interconnection.fyi also shows it active in the ERCOT queue. No source suggests withdrawal or suspension.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Silverton Solar is a proposed 401.2 MW solar generation project located in Briscoe County, Texas. Developed by NextEra Energy Interconnection Holdings, LLC, the project entered the ERCOT interconnection queue on December 4, 2023, under queue ID ERCOT-28INR0023. The proposed commercial operation date is July 1, 2029.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection (POI) is at the Tap 345kV 23914 Tule Canyon - 79001 Cross_W1. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Briscoe

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NextEra Energy Interconnection Holdings, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 23914 Tule Canyon - 79001 Cross_W1

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Tule Canyon Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.