Oriole Solar (ERCOT-28INR0008) — Project Summary

Queue ID
ERCOT-28INR0008
Capacity
503.91 MW
Technology
Solar+Battery
Status
active
Location
Knox, TX
Region
ERCOT
Developer
Rolling Plains Solar
IA Status
Facility Study

Oriole Solar

ERCOT-28INR0008BetaActiveSolarBatteryERCOTLBNL + Live

503.91 MW hybrid in Knox, TX · In queue since May 2023 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

503.91 MW

Capacity

1

Components

Solar

3y 2m

In Queue

Facility Study

IA Phase

COD target: 2028

Interconnection

Total Duration

5y 7m

Facilities Study50%
Queue EntryMay 15, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-29

Cross-source intelligence
Beta
Low confidence·4 sources·as of 2026-06-01
Expected COD
2028
From queue filing
Developer
Rolling Plains Solar
From queue filing
Status
Active
Active — Facility Study stage in ERCOT queue, no construction or financing announcements found
Financing
Unannounced
Key milestones
IA executedMay 2023Most recent

Project entered ERCOT queue as 28INR0008 in May 2023

source
About

Oriole Solar is a proposed 503.91 MW solar generation project located in Knox County, Texas. The developer is Rolling Plain Solar. It is in the ERCOT interconnection queue as entry ERCOT-28INR0008, with a queue entry date of May 15, 2023, and a proposed commercial operation date of December 29, 2028. The project's interconnection agreement status is currently in the Facility Study phase. The point of interconnection is at the Tap 345kV 6076 Foxtail - 60791 Perigee.

The Oriole Solar project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Knox

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Rolling Plains Solar

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 6076 Foxtail - 60791 Perigee

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
GPASTURE_ALL
POI Substation
Foxtail Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.