Tetris Solar
359 MW generation in Zapata, TX · In queue since July 2023 · Proposed COD July 2029
359 MW
Capacity
1
Components
Solar
3y 4m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6 years
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-07-01
Projected COD moved
2 times
Jan 2028 → Jul 2029
Net change
+18 months
first report to latest
Capacity
350 → 359 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
medium confidence at research time
- ercotqueue.com/project/28INR0005
- infrasure.ai/project/ercot-28inr0005-tetris-solar
- interconnection.fyi/project/ercot-28inr0005
- ercotqueue.com/developer/nextera
- quicksandcheck.com/texas/zapata-county/
Commercial operation date: No independent developer or press-release COD exists. Aggregators (infrasure.ai, ercotqueue.com 'Projected COD Q3 2029', Quicksand Check 'Jul 2029') only echo the ERCOT GIS/LBNL date of 2029-07-01.
Developer: The LBNL filing entity is NextEra Energy Interconnection Holdings LLC, an interconnection-holding affiliate of NextEra Energy. ercotqueue.com groups the project under the 'NextEra Energy' developer page. No press release or news article confirms an operating company.
Status: LBNL and ERCOT GIS-based trackers (interconnection.fyi, ercotqueue.com) show the project active with SS completed, FIS started and no IA. The interxdata 'operational' label is inconsistent with the facility study stage.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Tetris Solar is a proposed 350 MW solar generation project located in Zapata County, Texas. The project, being developed by NextEra Energy Interconnection Holdings LLC, is in the ERCOT interconnection queue as entry ERCOT-28INR0005, with a queue entry date of July 28, 2023. The proposed commercial operation date is July 1, 2029. The project's interconnection status is currently in the Facility Study phase.
Recent news coverage indicates industry interest in the development.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Zapata
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
NextEra Energy Interconnection Holdings LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
TAP 345kV 80307 Del Sol 7C - 80225 Cenizo 7C
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- Mesa del Sol Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.