Gulf Gateway Storage One (ERCOT-27INR0556) — Project Summary

Queue ID
ERCOT-27INR0556
Capacity
301.4 MW
Technology
Solar+Battery
Status
active
Location
San Patricio, TX
Region
ERCOT
Developer
Gulf Gateway Storage, LLC
IA Status
Facility Study

Gulf Gateway Storage One

ERCOT-27INR0556BetaActiveBatteryBatteryERCOTLBNL + Live

301.4 MW generation in San Patricio, TX · In queue since August 2025 · Proposed COD December 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

301.4 MW

Capacity

1

Components

Battery

1y 3m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 4m

Facilities Study50%
Queue EntryAug 26, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-01

Queue history
27INR0556 · 14 monthly ERCOT reports, Aug 2025 – Sep 2026

Projected COD moved

1 time

Jun 2027 → Dec 2029

Net change

+30 months

first report to latest

Capacity

301 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 26, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 5y 8m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest activityConstruction startFortune · 2021-03-09

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 1, 2029
From queue filing
Developer in saved assessment
Gulf Gateway Storage, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no interconnection agreement executed. No construction or permitting activity is publicly reported.
Financing
Not recorded
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-27inr0556-gulf-gateway-storage-one
  2. ercotqueue.com/project/27INR0556

Commercial operation date: Only the LBNL/ERCOT queue date (2029-12-01) is available, and the infrasure.ai aggregator repeats it as 'Proposed COD: 2029-12-01'. That page's narrative also cites June 24, 2027, which conflicts with its own header and is not a developer-sourced signal. No press release or news gives a financing-backed target.

Developer: Queue trackers (infrasure.ai, ercotqueue.com) list only Gulf Gateway Storage, LLC. The news-extracted 'Gambit Energy Storage LLC / Tesla' developer refers to a different project: a 100 MW battery in Angleton (Brazoria County), operational since 2021. It is not tied to this San Patricio County queue entry, so I rejected it. No parent company was identified.

Status: LBNL shows 'active' and the Facility Study stage, and ercotqueue.com shows 'No IA' with a 1% build-chance. Nothing found contradicts this or shows withdrawal. The Fortune 'construction_start' signal belongs to the unrelated Gambit project.

Project lifecycle
as of 2021-03-09
OperationalNoFortune · 2021-03-09
TechnologyBatteryFortune · 2021-03-09
DeveloperTesla (Gambit Energy Storage LLC)Fortune · 2021-03-09

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Gulf Gateway Storage One is a proposed 301.4 MW hybrid battery storage project located in San Patricio County, Texas. Developed by Gulf Gateway Storage, LLC, the project consists of battery energy storage and other unspecified technologies. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0556, with a queue entry date of August 26, 2025, and a proposed commercial operation date of June 24, 2027.

The project's point of interconnection (POI) is the 88249 SDI7A 345kV substation. The project is listed as a hybrid project in the ERCOT queue, combining battery storage with other technologies. The interconnection agreement (IA) status is not specified in the available data.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

San Patricio

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Gulf Gateway Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

88249 SDI7A 345kV

Data Source

LBNL + Live

DeveloperGambit Energy Storage LLCFortune · 2021-03-09
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.