Wagyu BESS SLF (ERCOT-27INR0519) — Project Summary

Queue ID
ERCOT-27INR0519
Capacity
120.55 MW
Technology
Battery
Status
suspended
Location
Brazoria, TX
Region
ERCOT
Developer
Wagyu BESS, LLC
IA Status
Facility Study

Wagyu BESS SLF

ERCOT-27INR0519BetaSuspendedBatteryERCOTLBNL + Live

120.55 MW storage in Brazoria, TX · In queue since June 2025 · Proposed COD December 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

120.55 MW

Capacity

1

Components

Battery

1y 5m

In Queue

Facility Study

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 6m

Suspended50%
Queue EntryJun 19, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-31

Queue history
27INR0519 · 13 monthly ERCOT reports, Jun 2025 – Jun 2026

Projected COD moved

0 times

Dec 2026 → Dec 2026

Net change

0 months

first report to latest

Capacity

121 MW

unchanged in the reports

Latest stage

Screening started

last listed Jun 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 19, 2025
On ERCOT's inactive listJul 2026 – Sep 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 31, 2026
From queue filing
Developer in saved assessment
Wagyu BESS, LLC
From queue filing
Status at research time
Active
Active — Facility Study phase in ERCOT queue, no public construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedJun 19, 2025

Project entered ERCOT interconnection queue in Facility Study phase

COD targetDec 31, 2026Latest in this assessment

Proposed commercial operation date per ERCOT queue filing

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of 2026-12-31. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity 'Wagyu BESS, LLC' is available. No news coverage found to identify parent company or operating entity behind this project-specific LLC.

Status: LBNL reports 'active' status in Facility Study phase. No news coverage or press releases found to provide additional ground-truth status updates.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Wagyu BESS SLF (ERCOT queue ID 27INR0519) is a proposed battery energy storage development project located in Brazoria County, Texas. The project is being developed by Wagyu BESS, LLC and has a total capacity of 120.55 MW, consisting entirely of a single battery storage component. It is proposed to interconnect to the grid at the 42410 Burke_POI_8 138kV point of interconnection.

The project entered the Electric Reliability Council of Texas (ERCOT) interconnection queue on June 19, 2025, with a proposed commercial operation date of December 31, 2026. Its interconnection agreement status is listed at the Facility Study stage. The project's overall queue status is currently recorded as suspended.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Jun 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Wagyu BESS, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

42410 Burke_POI_8 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.