Briefing on Wagyu BESS SLF

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
121 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Wagyu BESS SLF is a 121 MW Battery project in Texas, currently active.

Wagyu BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-31.

Queue ID
ERCOT-27INR0519
Location
Brazoria, Texas
Technology
Battery
Developer
Wagyu BESS, LLC
Market / region
ERCOT
Point of interconnection
42410 Burke_POI_8 138kV

What stands out

1

Wagyu BESS SLF is a 121 MW Battery project in Texas with status active.

2

Wagyu BESS, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-12-31.

Market and operating context

Queue date
2025-06-19
Proposed COD
2026-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Wagyu BESS SLF — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0519
LocationBrazoria, Texas
TechnologyBattery
DeveloperWagyu BESS, LLC
Market / regionERCOT
Point of interconnection42410 Burke_POI_8 138kV
Queue date2025-06-19
Proposed COD2026-12-31