Black Mountain Somervell Gas Combined
495.3 MW generation in Somervell, TX · In queue since April 2025 · Proposed COD September 2029
495.3 MW
Capacity
1
Components
Gas
1y 7m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 5m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-09-28
Projected COD moved
1 time
Jun 2027 → Sep 2029
Net change
+27 months
first report to latest
Capacity
495 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-27inr0497
- infrasure.ai/project/ercot-27inr0497-black-mountain-somervell-gas-combined
- cleanview.co/power-projects/planned/natural-gas-power-plants/texas/27INR0497/black-mountain-somervell-gas-combined
- star-telegram.com/news/local/article316067835.html
- star-telegram.com/news/local/article315770666.html
Commercial operation date: Only the ERCOT/LBNL filing gives a date (proposed COD 2029-09-28). Aggregators such as Infrasure and interconnection.fyi repeat it as 'Proposed commercial operation date per ERCOT interconnection queue filing', so they are not independent. No developer press release or news article gives a different target.
Developer: The project name contains 'Black Mountain', and Star-Telegram coverage describes Black Mountain as a Fort Worth-based energy consortium seeking gas turbines for data-center power. Fort Worth Power Core LLC is therefore probably its project shell. No source links the LLC to Black Mountain explicitly, so this is an inference.
Status: LBNL, Infrasure and interconnection.fyi all show the project as active with a Facility Study IA status and no IA date. The interxdata listing of 'operational' conflicts with LBNL's is_operational=false and with the 2029 proposed COD, so it was disregarded.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Black Mountain Somervell Gas Combined project is a proposed 495.3 MW gas-fired combined-cycle generation project in Somervell County, Texas. Developed by Fort Worth Power Core LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0497, with a queue entry date of April 21, 2025. The proposed commercial operation date is September 28, 2029.
The point of interconnection (POI) for the project is the Tap Comanche Peak SES Substation (#1900) to Johnson Switch (#1902) 345kV Line.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Somervell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Fort Worth Power Core LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap Comanche Peak SES Substation (#1900) to Johnson Switch (#1902) 345kV Line
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- Comanche
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.