Windjammer Windpower (ERCOT-27INR0383) — Project Summary

Queue ID
ERCOT-27INR0383
Capacity
292.58 MW
Technology
Wind
Status
active
Location
Glasscock, TX
Region
ERCOT
Developer
Windjammer Windpower, LLC
IA Status
IA Executed

Windjammer Windpower

ERCOT-27INR0383BetaActiveWindERCOTLBNL + Live

292.58 MW generation in Glasscock, TX · In queue since September 2024 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

292.58 MW

Capacity

1

Components

Wind

2y 2m

In Queue

IA Executed

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 3m

IA → COD

3 years

Total Duration

1y 3m

Construction75%
Queue EntrySep 10, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 3, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2028-12-31

Queue history
27INR0383 · 22 monthly ERCOT reports, Dec 2024 – Sep 2026

Projected COD moved

2 times

Dec 2027 → Dec 2028

Net change

+12 months

first report to latest

Capacity

293 → 244 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 10, 2024
Facilities study approvedMar 4, 2026
Interconnection agreement signedDec 3, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 31, 2028
From queue filing
Developer in saved assessment
Windjammer Windpower, LLC
From queue filing
Status at research time
IA Executed
IA Executed — interconnection agreement signed December 2025, project in pre-construction phase targeting 2028 COD
Financing
Not recorded

Milestones in this assessment

IA executedDec 3, 2025

Interconnection Agreement executed with ERCOT

lbnl_queue_snapshot
COD targetDec 31, 2028Latest in this assessment

Proposed commercial operation date per queue filing

lbnl_queue_snapshot
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. lbnl_queue_snapshot

Commercial operation date: Only LBNL queue data available with proposed COD of 2028-12-31. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity 'Windjammer Windpower, LLC' is available. No news sources found to identify a parent operating company or confirm if this is a project-specific shell LLC.

Status: LBNL shows IA executed on 2025-12-03, indicating the project has secured interconnection rights and is progressing through development milestones.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Windjammer Windpower is a proposed wind generation project located in Glasscock County, Texas, with a total capacity of 292.58 MW. The project, developed by Windjammer Windpower, LLC, consists entirely of wind turbines. It is currently in the ERCOT interconnection queue as entry ERCOT-27INR0383, with a queue entry date of September 10, 2024.

The proposed commercial operation date (COD) for Windjammer Windpower is December 31, 2028. The project's interconnection status is currently in the Facility Study phase. The point of interconnection (POI) is at the tap 345kV 59902 Sand Bluff Wind Farm - 59907 Bernoulli.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Glasscock

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Windjammer Windpower, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 59902 Sand Bluff Wind Farm - 59907 Bernoulli

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.