Briefing on Windjammer Windpower

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
293 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2028-12-31
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Windjammer Windpower is a 293 MW Wind project in Texas, currently active.

Windjammer Windpower, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-12-31.

Queue ID
ERCOT-27INR0383
Location
Glasscock, Texas
Technology
Wind
Developer
Windjammer Windpower, LLC
Market / region
ERCOT
Point of interconnection
tap 345kV 59902 Sand Bluff Wind Farm - 59907 Bernoulli

What stands out

1

Windjammer Windpower is a 293 MW Wind project in Texas with status active.

2

Windjammer Windpower, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-12-31.

Market and operating context

Queue date
2024-09-10
Proposed COD
2028-12-31
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Windjammer Windpower — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0383
LocationGlasscock, Texas
TechnologyWind
DeveloperWindjammer Windpower, LLC
Market / regionERCOT
Point of interconnectiontap 345kV 59902 Sand Bluff Wind Farm - 59907 Bernoulli
Queue date2024-09-10
Proposed COD2028-12-31