Beaverhead Storage SLF
61.5 MW generation in Jim Wells, TX · In queue since August 2024 · Proposed COD July 2027
61.5 MW
Capacity
1
Components
Battery
1y 9m
In Queue
Facility Study
IA Phase
COD target: 2027
Total Duration
2y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-07-31
The proposed energy storage project, known in the ERCOT interconnection queue as ERCOT-27INR0308, is a 61.5 MW battery storage facility. Located in Jim Wells County, Texas, the project is being developed by Pronghorn Storage, LLC, though the project entity is slated to change to Beaverhead Solar, LLC. It entered the ERCOT queue on August 16, 2024, with a proposed commercial operation date of July 31, 2027.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection (POI) is directly to Sub 69kv #5653 Ben Bolt. The project has appeared in recent news.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Jim Wells
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Beaverhead Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Direct to Sub 69kv #5653 Ben Bolt.
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.