Briefing on Beaverhead Storage SLF

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
62 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-07-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Beaverhead Storage SLF is a 62 MW Solar+Battery project in Texas, currently active.

Beaverhead Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-07-31.

Queue ID
ERCOT-27INR0308
Location
Jim Wells, Texas
Technology
Solar+Battery
Developer
Beaverhead Solar, LLC
Market / region
ERCOT
Point of interconnection
Direct to Sub 69kv #5653 Ben Bolt.

What stands out

1

Beaverhead Storage SLF is a 62 MW Solar+Battery project in Texas with status active.

2

Beaverhead Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-07-31.

Market and operating context

Queue date
2024-08-16
Proposed COD
2027-07-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Beaverhead Storage SLF — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0308
LocationJim Wells, Texas
TechnologySolar+Battery
DeveloperBeaverhead Solar, LLC
Market / regionERCOT
Point of interconnectionDirect to Sub 69kv #5653 Ben Bolt.
Queue date2024-08-16
Proposed COD2027-07-31