Atticus Energy Storage
102.98 MW storage in Sutton, TX · In queue since March 2024 · Proposed COD March 2027
102.98 MW
Capacity
1
Components
Battery
2y 4m
In Queue
Facility Study
IA Phase
COD target: 2027
Total Duration
3 years
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-03-01
Entered ERCOT interconnection queue, Facility Study phase
The Atticus Energy Storage project is a proposed 102.98 MW battery storage project located in Sutton County, Texas. The project is being developed by Atticus Energy Storage and has appeared in recent news coverage. It is interconnected within the ERCOT queue as entry ERCOT-27INR0236, with a queue entry date of March 29, 2024.
The proposed commercial operation date (COD) for the Atticus Energy Storage project is March 1, 2027. The project's interconnection agreement (IA) status is currently in the Facility Study phase. The point of interconnection (POI) is the 6570 Bond Road Substation 69KV.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Sutton
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Atticus Energy Storage
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 69 KV 6570 Bond Road - 6513 Sonora
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Atticus Energy StorageForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.