Briefing/projectactive
Atticus Energy Storage is a 103 MW Battery project in Texas, currently active.
Atticus Energy Storage is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-03-01.
- Queue ID
- ERCOT-27INR0236
- Location
- Sutton, Texas
- Technology
- Battery
- Developer
- Atticus Energy Storage
- Market / region
- ERCOT
- Point of interconnection
- Tap 69 KV 6570 Bond Road - 6513 Sonora
What stands out
1
Atticus Energy Storage is a 103 MW Battery project in Texas with status active.
2
Atticus Energy Storage is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-03-01.
Market and operating context
- Queue date
- 2024-03-29
- Proposed COD
- 2027-03-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.