Easy Battery Energy Storage Center (ERCOT-27INR0231) — Project Summary

Queue ID
ERCOT-27INR0231
Capacity
200 MW
Technology
Wind+Battery
Status
active
Location
Schleicher, TX
Region
ERCOT
Developer
Easy Wind Energy Center, LLC
IA Status
Facility Study

Easy Battery Energy Storage Center

ERCOT-27INR0231BetaActiveBatteryBatteryERCOTLBNL + Live

200 MW generation in Schleicher, TX · In queue since March 2024 · Proposed COD June 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

200 MW

Capacity

1

Components

Battery

2y 8m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 3m

Facilities Study50%
Queue EntryMar 29, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-15

Queue history
27INR0231 · 31 monthly ERCOT reports, Mar 2024 – Sep 2026

Projected COD moved

2 times

Jun 2027 → Jun 2029

Net change

+24 months

first report to latest

Capacity

200 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 29, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Dec 1, 2027
Differs from queue: Jun 15, 2029From queue filing
Developer in saved assessment
Easy Wind Energy Center, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage in ERCOT queue as of March 2024, no public construction or financing announcements
Financing
Not recorded

Milestones in this assessment

IA executedMar 29, 2024Latest in this assessment

Entered ERCOT interconnection queue, Facility Study stage

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of December 2027. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity available. No press releases or corporate announcements found to identify a parent operating company distinct from the LLC filing entity.

Status: LBNL status shows Active with Facility Study in progress. No news coverage found to indicate project advancement beyond interconnection study phase.

Project lifecycle
as of 2026-03-09
OperationalNoStock Titan · 2026-03-09
TechnologygasStock Titan · 2026-03-09
DeveloperFermi AmericaStock Titan · 2026-03-09
Permit decisionGrantedStock Titan · 2026-03-09

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Easy Battery Energy Storage Center is a proposed 200 MW battery storage project in Schleicher County, Texas. Developed by Easy Wind Energy Center, LLC, the project entered the ERCOT interconnection queue as ERCOT-27INR0231 on March 29, 2024. Its proposed commercial operation date is December 1, 2027.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345 kV 76003 Big Hill to 76005 Schneeman Draw. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Schleicher

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Easy Wind Energy Center, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 76003 Big Hill to 76005 Schneeman Draw

Data Source

LBNL + Live

ApplicantFermi AmericaStock Titan · 2026-03-09
AgencyTexas Commission on Environmental QualityStock Titan · 2026-03-09
RulingApprovalStock Titan · 2026-03-09
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.