Briefing on Easy Battery Energy Storage Center

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
200 MW
Proposed capacity
active
Current status
Wind+Battery
Technology
ERCOT
Market / region
2027-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Easy Battery Energy Storage Center is a 200 MW Wind+Battery project in Texas, currently active.

Easy Wind Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.

Queue ID
ERCOT-27INR0231
Location
Schleicher, Texas
Technology
Wind+Battery
Developer
Easy Wind Energy Center, LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV 76003 Big Hill to 76005 Schneeman Draw

What stands out

1

Easy Battery Energy Storage Center is a 200 MW Wind+Battery project in Texas with status active.

2

Easy Wind Energy Center, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-01.

4

Latest linked story: “Texas backs 11GW private AI power campus with 6GW clean air permit” (Stock Titan, 2026-03-09).

Market and operating context

Queue date
2024-03-29
Proposed COD
2027-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Easy Battery Energy Storage Center — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0231
LocationSchleicher, Texas
TechnologyWind+Battery
DeveloperEasy Wind Energy Center, LLC
Market / regionERCOT
Point of interconnectionTap 345 kV 76003 Big Hill to 76005 Schneeman Draw
Queue date2024-03-29
Proposed COD2027-12-01