New Shepherd Solar (ERCOT-27INR0152) — Project Summary

Queue ID
ERCOT-27INR0152
Capacity
150.81 MW
Technology
Solar
Status
active
Location
Karnes, TX
Region
ERCOT
Developer
New Shepherd Energy Center, LLC
IA Status
Facility Study

New Shepherd Solar

ERCOT-27INR0152BetaActiveSolarERCOTLBNL + Live

150.81 MW generation in Karnes, TX · In queue since January 2024 · Proposed COD September 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

150.81 MW

Capacity

1

Components

Solar

2y 10m

In Queue

Facility Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 8m

Facilities Study50%
Queue EntryJan 11, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-09-30

Queue history
27INR0152 · 33 monthly ERCOT reports, Jan 2024 – Sep 2026

Projected COD moved

3 times

Aug 2027 → Sep 2030

Net change

+37 months

first report to latest

Capacity

151 → 151 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 11, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Project statusOperationalDemocrat and Chronicle · 2025-09-20

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2030
From queue filing
Developer in saved assessment
New Shepherd Energy Center, LLC
From queue filing
Status at research time
Active
Active — Facility Study phase per LBNL queue as of Jan 2024, no public construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedJan 11, 2024Latest in this assessment

Entered ERCOT interconnection queue, Facility Study phase

lbnl_queue_snapshot
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. lbnl_queue_snapshot

Commercial operation date: Only LBNL queue data available showing proposed COD of 2030-09-30. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity available. No press releases or corporate announcements found to identify a parent operating company. Entity name suggests project-specific LLC but no parent company identified.

Status: LBNL shows active status in Facility Study phase. No news coverage found to provide additional ground-truth status updates.

Project lifecycle
as of 2026-04-08
OperationalNoThe Daily Gazette · 2026-04-08
TechnologySolarThe Daily Gazette · 2026-04-08
Permit decisionContestedThe Daily Gazette · 2026-04-08

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The New Shepherd Solar project is a proposed solar generation facility with a total capacity of 150.81 MW. Located in Karnes County, Texas, the project is being developed by New Shepherd Energy Center, LLC. It is currently in the ERCOT interconnection queue as project ERCOT-27INR0152, with an interconnection queue entry date of January 11, 2024. The proposed commercial operation date is September 30, 2029, and its interconnection agreement status is currently in the Facility Study phase.

The proposed project's point of interconnection is the Kenedy Switching Station #2 (#8186) _x0013_ Rosata POD (#8153) line, AEP. Recent news coverage indicates activity related to the project, with five articles categorized under grid, industry, and deals.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Karnes

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

New Shepherd Energy Center, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

the Kenedy Switching Station #2 (#8186) – Rosata POD (#8153) line, AEP.

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Kenedy Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (3)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.