New Shepherd Solar is a 151 MW Solar project in Texas, currently active.
New Shepherd Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-09-30.
- Queue ID
- ERCOT-27INR0152
- Location
- Karnes, Texas
- Technology
- Solar
- Developer
- New Shepherd Energy Center, LLC
- Market / region
- ERCOT
- Point of interconnection
- the Kenedy Switching Station #2 (#8186) – Rosata POD (#8153) line, AEP.
What stands out
New Shepherd Solar is a 151 MW Solar project in Texas with status active.
New Shepherd Energy Center, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2030-09-30.
Latest linked story: “Gubernatorial candidate Blakeman rails against Copake solar farm” (The Daily Gazette, 2026-04-08).
Market and operating context
- Queue date
- 2024-01-11
- Proposed COD
- 2030-09-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.