Bigway Solar I (ERCOT-27INR0127) — Project Summary

Queue ID
ERCOT-27INR0127
Capacity
203 MW
Technology
Solar
Status
active
Location
King, TX
Region
ERCOT
Developer
NextEra Energy Interconnection Holdings, LLC
IA Status
IA Executed

Bigway Solar I

ERCOT-27INR0127BetaActiveSolarERCOTLBNL + Live

203 MW generation in King, TX · In queue since January 2024 · Proposed COD December 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

203 MW

Capacity

1

Components

Solar

2y 10m

In Queue

IA Executed

IA Phase

Signed Feb 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 1m

IA → COD

2y 10m

Total Duration

1y 1m

Construction75%
Queue EntryJan 11, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementFeb 15, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-12-31

Queue history
27INR0127 · 31 monthly ERCOT reports, Mar 2024 – Sep 2026

Projected COD moved

2 times

Jul 2029 → Dec 2027

Net change

-19 months

first report to latest

Capacity

200 → 195 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 11, 2024
Interconnection agreement signedFeb 15, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 31, 2027
From queue filing
Developer in saved assessment
NextEra Energy Resources
Filed as NextEra Energy Interconnection Holdings, LLC
Status at research time
IA Executed
IA Executed — interconnection agreement signed February 2025, project in pre-construction phase targeting late 2027 operation
Financing
Not recorded

Milestones in this assessment

IA executedFeb 15, 2025

Interconnection Agreement executed with ERCOT

lbnl_queue_snapshot
COD targetDec 31, 2027Latest in this assessment

Proposed commercial operation date per interconnection agreement

lbnl_queue_snapshot
Research sources and reasoning (1 recorded sources)

medium confidence at research time

  1. lbnl_queue_snapshot

Commercial operation date: Only LBNL queue data available with proposed COD of 2027-12-31. No independent news or press releases found to validate or contradict this date.

Developer: LBNL filing entity is 'NextEra Energy Interconnection Holdings, LLC', which is NextEra's standard interconnection subsidiary used for queue filings. The operating parent company is NextEra Energy Resources, the competitive energy division of NextEra Energy Inc.

Status: LBNL shows IA executed on 2025-02-15 with active status. This is recent and authoritative for queue position. No contradictory information found in research.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Bigway Solar I is a proposed 200 MW solar generation project located in King County, Texas. The developer is NextEra Energy Interconnection Holdings, LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0127, with a queue entry date of January 11, 2024. The proposed commercial operation date is December 31, 2027. The project's interconnection status is currently in the Facility Study phase.

The point of interconnection is Tap 345kV 59904 Cottonwood - 60500 Edith Clarke Ckt #2. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

King

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NextEra Energy Interconnection Holdings, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 59904 Cottonwood - 60500 Edith Clarke Ckt #2

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Cottonwood Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.