Query
Bigway Solar I
Type
Entity Briefing
Entity
Bigway Solar I
Generated
2026-10-19T23:46:50.682Z

Briefing on Bigway Solar I

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
203 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2027-12-31
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Bigway Solar I is a 203 MW Solar project in Texas, currently active.

NextEra Energy Interconnection Holdings, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-12-31.

Queue ID
ERCOT-27INR0127
Location
King, Texas
Technology
Solar
Developer
NextEra Energy Interconnection Holdings, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 59904 Cottonwood - 60500 Edith Clarke Ckt #2

What stands out

1

Bigway Solar I is a 203 MW Solar project in Texas with status active.

2

NextEra Energy Interconnection Holdings, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-12-31.

Market and operating context

Queue date
2024-01-11
Proposed COD
2027-12-31
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Bigway Solar I — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0127
LocationKing, Texas
TechnologySolar
DeveloperNextEra Energy Interconnection Holdings, LLC
Market / regionERCOT
Point of interconnectionTap 345kV 59904 Cottonwood - 60500 Edith Clarke Ckt #2
Queue date2024-01-11
Proposed COD2027-12-31