Cottonseed Energy Storage (ERCOT-27INR0102) — Project Summary

Queue ID
ERCOT-27INR0102
Capacity
207.6 MW
Technology
Battery
Status
active
Location
Wharton, TX
Region
ERCOT
Developer
Cottonseed Energy Storage LLC
IA Status
Facility Study

Cottonseed Energy Storage

ERCOT-27INR0102BetaActiveBatteryERCOTLBNL + Live

207.6 MW storage in Wharton, TX · In queue since November 2023 · Proposed COD April 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

207.6 MW

Capacity

1

Components

Battery

3 years

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 5m

Facilities Study50%
Queue EntryNov 14, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-04-20

Queue history
27INR0102 · 35 monthly ERCOT reports, Nov 2023 – Sep 2026

Projected COD moved

0 times

Apr 2027 → Apr 2027

Net change

0 months

first report to latest

Capacity

208 MW

unchanged in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 14, 2023
Facilities study approvedAug 23, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Apr 20, 2027
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active — Facility Study stage per LBNL queue, no public construction or financing announcements found
Financing
Not recorded

Milestones in this assessment

IA executedNov 2023Latest in this assessment

Entered ERCOT queue as 27INR0102, currently in Facility Study phase

cleanview.co
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. totalenergies.com/newsroom/renewables-totalenergies-starts-its-largest-utility-scale-solar-farms-batteries/?lang=eng
  2. cleanview.co/power-projects/planned/battery-storage-projects/texas/27INR0102/cottonseed-energy-storage
  3. interconnection.fyi/projects/state/TX
  4. renewablesinfo.org/project/ercot-27inr0102-cottonseed-energy-storage
  5. bizapedia.com/de/cottonseed-energy-storage-llc.html

Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-04-20. No press releases, financing announcements, or construction updates found in search results to validate or contradict this date. All search results are aggregator sites echoing queue data.

Developer: LBNL filing entity is 'Cottonseed Energy Storage LLC' (Delaware LLC per Bizapedia). No press releases, corporate announcements, or news coverage identify a parent/operating company. Search results only echo the LLC name from queue data.

Status: LBNL status is 'active' with IA status 'Facility Study'. No search results indicate construction start, financing close, or project withdrawal. Status appears current but project remains in early interconnection phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Cottonseed Energy Storage is a proposed 207.6 MW battery storage project located in Wharton County, Texas. The project, developed by Cottonseed Energy Storage LLC, is currently in the ERCOT interconnection queue as entry ERCOT-27INR0102, with a queue entry date of November 14, 2023. Its proposed commercial operation date is April 20, 2027, and its interconnection agreement status is currently in the Facility Study phase.

The point of interconnection (POI) for the project is South Lane City and PSEE # is 43190. The project consists entirely of battery storage, with a total capacity of 207.6 MW. The project has appeared in recent news coverage regarding energy storage developments in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Wharton

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Cottonseed Energy Storage LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

South Lane City and PSEE # is 43190

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.