Query
Cottonseed Energy Storage
Type
Entity Briefing
Entity
Cottonseed Energy Storage
Generated
2026-10-19T21:45:09.362Z

Briefing on Cottonseed Energy Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
208 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-04-20
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Cottonseed Energy Storage is a 208 MW Battery project in Texas, currently active.

Cottonseed Energy Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-04-20.

Queue ID
ERCOT-27INR0102
Location
Wharton, Texas
Technology
Battery
Developer
Cottonseed Energy Storage LLC
Market / region
ERCOT
Point of interconnection
South Lane City and PSEE # is 43190

What stands out

1

Cottonseed Energy Storage is a 208 MW Battery project in Texas with status active.

2

Cottonseed Energy Storage LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-04-20.

Market and operating context

Queue date
2023-11-14
Proposed COD
2027-04-20
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cottonseed Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0102
LocationWharton, Texas
TechnologyBattery
DeveloperCottonseed Energy Storage LLC
Market / regionERCOT
Point of interconnectionSouth Lane City and PSEE # is 43190
Queue date2023-11-14
Proposed COD2027-04-20